Housari Corp. completed the HVAC works for **Al Yarmouk University Extension**, located on **Daraa Highway, Damascus**.
Covering an estimated area of **1,600 m²**, the project was completed in **2025** and included the implementation of HVAC systems with a total cooling capacity of **70 tons**.
The work was carried out to ensure efficient air conditioning performance, reliable indoor climate control, and comfortable conditions suitable for university facilities.
Through this project, Housari Corp. contributed its technical expertise in mechanical systems to support the functionality and long-term operational efficiency of the building, under the consultancy of **Eng. Nassar Abou Halaweh**.


